HAMMERSMITH
FLYOVER PROJECT

(London, United Kingdom)

Hammersmith Flyover Project-1

Costain is a leading UK engineering and construction company with a portfolio that spans more than 140 years. One of the UK’s top solutions providers, the Costain strategy aimed at identifying, developing and implementing innovative solutions to meet the UK’s major national infrastructure needs.

In 2013, Transport for London (TfL) awarded Costain a £60million repair deal to strengthen and refurbish the Hammersmith Flyover in West London. The project was one of the first deals awarded as part of TfL’s structures and tunnels investment portfolio (STIP).

Completed in 1961, the Hammersmith Flyover carries the four-lane A4 arterial road over the Hammersmith gyratory and links the west to central London. Used by 90,000 vehicles a day, it was closed at the end of 2011 when it was found that water and salt from winter gritting had leaked into the structure, corroding the structural post tensioning cables which supported 16 arches.

Costain - Outcome 1

Safe to use

for decades to come

Costain - Outcome 3

Less

congestion and traffic delays

Costain - Outcome 2

Adaptable

to weather conditions

The work to strengthen the flyover sough to prolong its life and ensure that no major maintenance would be required for many years and this vital part of the road network would continue serving London for years to come.

Costain was tasked with strengthening the remaining structure, and replacing the existing post tensioning strands with a new system. The bridge deck is supported on a single central row of piers comprising 16 spans — eleven at 42.7m long, two at 30.5m, two at 36.6m and one at 22.6m — giving a total length of 626m. The approach ramps at either end increase the total length to 863m.

The works also included replacing the roller bearings on the 15 piers and replacing the abutment bearings, renewing the bridge deck waterproofing, bridge deck drainage and outfalls, replacing expansion joints, renewing the carriageway surfacing, and replacing the existing central reservation safety barrier along the length of the structure.

Due to the age and size of the flyover, as well as its strategic importance to London’s transport infrastructure, it was critical that the project be completed on time and to the highest of standards – while minimizing traffic disruption on this technically challenging project.

At the early stages of the project, it clear that the project would need a Common Data Environment capable of handling the specific 3D design software. Additionally, as a federated model solution, designs need to be imported from various design products such as Autodesk Inventor and Revit. Asite’s Navigator module made it possible to have fully synchronized and collaborative 3D model elements and aided with clash detection with federated model amalgamation.

The project was completed in 2015 and Asite were pleased to play their part in extending the life of this structure for many decades to come. Asite’s Common Data Environment provided a centralized online environment that the entire project team could use to manage their data and files. In particular, Asite’s solution enabled Costain and the project designer to view and federate 3D project model elements from different native software.

Over 54,000 companies use Asite to help them build better.

Blogs

5 signs it's time to upgrade your information management system

Managing the documentation for multimillion-pound projects on basic tools like SharePoint isn’t just inefficient—it’s risky. From contract management to project financials, every aspect of a...
Asite

Blogs

Asite Release AI Room Identification Tool Enabled by Google Cloud

London, UK, [4th February, 2025] – Asite, the construction industry’s leading collaboration platform, announces the launch of its cutting-edge AI-powered Room Identification Tool. This game-changing ...
Asite

Blogs

How to Manage Construction Document Overload: 3 Strategies for Success

With tightening profit margins, the stakes are higher than ever—mismanaged documents can lead to missed deadlines, cost overruns, and compliance risks.
Asite
  • asite-icon

    Marketplace

    Marketplace

    Build your network with project owners, contractors, and subcontractors. Marketplace enables project owners to build project teams, allows contractors to qualify new partners, and helps subcontractors to discover new opportunities.

    Discover More
  • Ecosystem

    Ecosystem

    Improve performance with solutions and third-party applications that integrate with the Asite Platform. Connect to your existing systems through software plugins to work the way you want.

    Discover More